Image shows installation of rear part of main girder equipment installation works.
|
.jpg)
Start of lifting of the whole upper part- weight apx. 350 Tons
|
.jpg)
Beautiful, Isn't It, upper part reaching 43m hight!!!
|
.jpg)
In July we loaded the crane onto the barge.
Total weight apx. 670 Tons.
|
.jpg)

Barge & Crane at Container Terminal ready for roll of operation:
Operation was performed the same day and than crane was lifted and the gantry boogies have been turned for 90deg.
|
.jpg)
Container Crane on the barge ready for transport to Koper Container terminal.