Port of Astakos, 3pc. 50T Ship to Shore Container Cranes.
 Panoram Astakaos

Astakos
Lifting of upper part of crane structure, (apx. 480 metricTons) of the first Crane

Astakos
Installation of  boom (114 Ton) and Stays, to the 2nd Crane.

Astakos

Astakos

Astakos
Erection of Leg frame2nd Crane. (Leg Frame weight: 104 tons)

Astakos

Astakos
Lifting up 2nd Crane upper part onto leg frames. View from the boom of
the first crane.

Astakos
Astakos
Astakos
Astakos
Astakos

All three Cranes at Port under construction works.
Crane hight with boom up-92meters, tower at 68m, trolley rail at 40m above ground rail level. Capacity  SWL 50T under the spreader

 

In March 2006, assembly of 3rd Container Crane

was Completed!

 

 